Heavy Industry – For the Toughest Requirements
Explore the Heavy Industry map below to find where to locate in the region.
The future of heavy industry is built here – with room, power and water
The Terho brothers—Mikko, Martti, and Mauno—founded Autolava Oy in the 1940s after growing frustrated that a large part of a truck driver’s workday was spent waiting for the truck to be loaded. They began to wonder if there was a more efficient way to do the job and realized that, using a specific technique, a roll-off container could be winched onto a truck, allowing the trucks to always remain productive. This led to the invention of the now market leading MULTILIFT demountables, which was transferred to Hiab through corporate acquisitions in the 1970s and is now the only product manufactured by Hiab Raisio.
The Raisio production facility is currently undergoing a major strategic transformation. New office spaces are being built on the factory grounds, the old factory is being modernized, and a new prototype workshop is also being constructed to support product development. The new energy-efficient facilities are expected to be operational by the end of 2027.
Every day, truckloads of MULTILIFT skiploaders and hooklifts leave Raisio via ports, mainly bound for European markets, but some as far as New Zealand—totaling thousands of units per year. Smooth and improving connections to ports thanks to upgrades to the E18 highway, a reliable electricity supply, the skilled workforce in the Turku region, and the City of Raisio’s supportive cooperation create excellent conditions for manufacturing the units in Raisio.
Reliable infractructure
A stable and functional infrastructure is essential for a factory like this, and we welcome the planned data centre in the area. It signals that the region is being developed systematically and that power availability will remain strong in the future. Turku has good connections to Europe, and our collaboration with the City of Raisio has been excellent over the years. Given the current somewhat turbulent global situation, Southwest Finland is a good base from which to operate.
Jussi Peltoniemi
Director of Operations, Hiab Raisio

Why locate to Heavy Industry area?
This is the Turku region’s premier location for heavy, large-scale and energy-intensive industries requiring extensive land availability and room for future expansion.
The area is being developed with a clear long-term vision and currently offers significant amounts of zoned greenfield land suitable even for major industrial investments. Excellent transport connections to ports and the national road network ensure efficient logistics, while Turku city centre and its skilled workforce are only a 15-minute drive away.
The area is supported by strong utility infrastructure, including district heating and water networks, and plans are in place for a new 400 kV substation to meet the needs of energy-intensive industrial operations.
Companies investing here benefit not only from the strategic location and available infrastructure, but also from a business-friendly operating environment. The municipalities in the area are committed to enabling growth and work closely with investors to ensure projects move forward efficiently and smoothly.
If you would like to learn more about the opportunities available, please get in touch. We would be happy to discuss your plans and help you find the right solution for your investment.
Did you know?
Finnish electricity is 95% CO2 free and the cheapest in Europe.


In Focus
New High-Value Industrial Park Taking Shape in the Turku Region
A major new industrial area in the western part of the region is being developed to accommodate large-scale industrial and green transition investments.
Heavy Industry – Key Infrastructure
Extensive greenfield industrial land available, with more than 100 hectares of zoned land and significant expansion potential for large-scale industrial, manufacturing and energy-intensive investments.
Raisionkaari and Isosuo industrial districts, forming the core of a growing western industrial belt spanning Raisio, Naantali and Masku, with space for multiple industrial clusters and large anchor investments.
Strong energy infrastructure, including existing 110 kV grid connections and planned 400 kV transmission infrastructure and substation capacity to support energy-intensive industries and future large-scale investments.
Access to skilled workforce and RDI expertise, with Turku city centre, universities and research organisations located within a 15–20 minute drive from the area.
Smart Chemistry Park in Raisio, offering laboratory, pilot-scale, office and production-ready facilities for companies in chemistry, bioeconomy, circular economy and clean technologies.
District heating, water and wastewater networks in place, providing industrial-scale utility capacity and reducing development lead times for new projects.
Excellent multimodal logistics connections, with direct access to the E18 and E8 highways, rail connections, and both the Port of Turku and the Port of Naantali within approximately 15–20 minutes.
Proximity to ports and international trade routes, providing efficient access to Scandinavian and European markets through the TEN-T transport network and the nearby ports.
Established industrial ecosystem, including manufacturing, food processing, logistics and emerging green transition industries, creating opportunities for industrial collaboration and circular economy solutions.
Business-friendly municipalities and plug-and-play development model, with coordinated regional development aimed at enabling fast project execution and smooth investment processes.



